Keystone Dam bridge replacement progressing nicely
Gaping hole number one was the beginning of a replacement span of the roadway bridge over Keystone Lake Dam. This is the first of three spans removed. This will be repeated 18 times to replace roadway built over the dam structure in 1964. Completion of the replacement spans is expected by November 2014.

Download Image: Full Size (2.13 MB)
Tags:
Photo by: Ross Adkins |  VIRIN: 140124-A-CE999-086.JPG