Kansas Water Office begins dredging operations at John Redmond Reservoir
This electric dredge will remove more than 3 million cubic yards of sediment from John Redmond Reservoir in Kansas.

Download Image: Full Size (0.82 MB)
Photo by: Brannen Parrish |  VIRIN: 160516-A-PO406-001.JPG