PURPOSE:  The purpose of these public notices are to inform you of a proposal for work in which you might be interested and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest.

SECTION 10: The U.S. Army Corps of Engineers is directed by Congress through Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) to regulate all work or structures in or affecting the course, condition, or capacity of navigable waters of the United States.  The intent of this law is to protect the navigable capacity of waters important to interstate commerce.

SECTION 404: The U.S. Army Corps of Engineers is directed by Congress through Section 404 of the Clean Water Act (33 USC 1344) to regulate the discharges of dredged and fill material into all waters of the United States.  These waters include lakes, rivers, streams, mudflats, sandflats, sloughs, wet meadows, natural ponds, and wetlands adjacent to other waters.  The intent of the law is to protect these waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical, and biological integrity.

U.S. Army Corps of Engineers, Tulsa District

Regulatory Office, Chief

918-669-7400

 

Results:
Archive: October, 2019
Clear
  • NATIONWIDE PERMIT (NWP) PRE-CONSTRUCTION NOTIFICATION (PCN) THE RELEASE OF FORM ENG 6082

    Certain NWPs require project proponents to notify Corps district engineers of their proposed activities prior to conducting the activities authorized by those NWPs, so that the district engineers can make case-specific determinations of NWP eligibility. The notification takes the form of a pre-construction notification (PCN). The purpose of a PCN is to give the district engineer an opportunity to review a proposed NWP activity to ensure that the proposed activity qualifies for NWP authorization. In most cases, the district engineer has 45 days after receipt of a complete PCN to determine whether the proposed activity qualifies for NWP authorization or requires another form of Corps authorization. More information on when an activity requires a PCN can be found in the Federal Register Notice: https://www.govinfo.gov/content/pkg/FR-2017-01-06/pdf/2016-31355.pdf
  • SWT-2019-538

    Expiration date: 11/7/2019

    The application is for an expansion of the Muscogee (Creek) Nation Casino parking lot. The applicant considers the expansion of the existing casino facilities as necessary to support operations on Indian Trust land .