Documents for current and prior projects with public comment periods are provided below. Use the dropdown menu to select projects that are available below.

If you have questions or comments about a project after reviewing the available documents, use the drop down menu to select it, and submit your public comment. Only studies or projects currently in the 30-day comment period are available for comment. 

Notice for Users of Assistive Technology

We are working to ensure available documents are compatible with assistive reading technology but some documents may predate advances in this area. If you utilize assistive reading technology and are unable to access available documents, please reach out to us at 918-669-7366 and we will attempt to contact the document's author to provide a compatible document to you. We apologize for any inconvenience.

Documents for Public Review

Collapse All Expand All
Expand List item 39779Collapse List item 39779  MIDWEST CITY WATER INFRASTRUCTURE IMPROVEMENTS PROJECT - Public Comment Period -  March 20, 2026 to April 19, 2026
Expand List item 33547Collapse List item 33547  San Francisco Waterfront Coastal Flood Study, CA

The U.S. Army Corps of Engineers (USACE), in collaboration with the Port of San Francisco and the City of San Francisco, has reached an important milestone in the San Francisco Waterfront Coastal Flood Study (Flood Study) - the release of the Draft Integrated Feasibility Report and Environmental Impact Statement (Draft Report and EIS).

The following Draft Report and EIS documents are available for download and review:

San Francisco Waterfront Coastal Flood Study Draft Integrated Feasibility Report and Environmental Impact Statement

Appendix A: Plan Formulation

Appendix B: Engineering Appendix

Sub-Appendix B.1: Hydrology, Hydraulics and Coastal

Attachment B.1.1: Coastal Extreme Water Levels and High Tide Flooding

Attachment B.1.2 (Part 1): Future Without Project and Future With Project Maps

Attachment B.1.2 (Part 2): Future Without Project and Future With Project 2040 Only Maps

Attachment B.1.2 (Part 3): Total Net Benefits Plan Maps

Attachment B.1.2 (Part 4): Total Net Benefits Plan Decadal Maps

Attachment B.1.3: Wave Overtopping Sensitivity Assessment

Attachment B.1.4: Hydrology and Hydraulics Interior Drainage Analysis

Attachment B.1.5: Shallow Groundwater

Sub-Appendix B.2: Coastal Life-Safety

Sub-Appendix B.3: Earthquake Life-Safety and Resilience

Sub-Appendix B.4: Array of Alternatives (B-G) Plan View Figures

Sub-Appendix B.5: Total Net Benefits Plan (TNBP) and Independent Measures for Consideration Plan View Figures

Appendix C: Cost Engineering

Appendix D: Environmental and Cultural Resources

Appendix E: Economic and Social Considerations

Appendix F: Real Estate Plan

Appendix G: Monitoring and Adaptation Plan

Appendix H: Public Involvement

Appendix I: Engineering with Nature

Appendix J: Climate

Appendix K: Mitigation

The public is invited to submit comments on the Flood Study Draft Report and EIS between Friday, February 26 and Friday, March 29, 2024, when the comment period will close.

Comments are being accepted through any of the following ways:

U.S. Army Corps of Engineers,

Tulsa District

ATTN: RPEC-SFWS

2488 E 81st St.

Tulsa, OK 74137

  • In-person at the public meetings: Comment cards will be available, as well as a station to record verbal comments

 

Four public meetings will be held in the San Francisco area:

Mission Bay/Mission Creek

February 26, 2024

5:30-7:00

Atwater Tavern (upstairs)

295 Terry A. Francois Blvd.

San Francisco, CA 94158

 

 

Islais Creek/Bayview

February 27, 2024

5:30-7:00

Southeast Community Center

1550 Evans Ave.

San Francisco, CA 94124

Fisherman’s Wharf

February 28, 2024

5:30-7:00

TBD

 

Embarcadero

February 29, 2024

5:30-7:00

Exploratorium

Pier 15 Embarcadero at, Green St.

San Francisco, CA 94111

To learn more about the Flood Study and explore the Tentatively Selected Plan (also referred to as the Draft Plan), visit our interactive StoryMap

 

 

 

 

 

 

 

 

 

 

 

 

Expand List item 28162Collapse List item 28162  MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM DREDGING 2021
Expand List item 17671Collapse List item 17671  

ARKANSAS RIVER CORRIDOR STUDY

Submit Comments During the 30-Day Comment Period

You can enter up to 1000 characters