History of the Tulsa District

Tulsa District was founded in 1939 in the heartland of the country to provide engineering support to the nation at a time of great contrast. The vivid memories of the 1936 flood — one of the greatest and most widespread flooding disasters ever seen — contrasted with the drought which tried to squeeze the life out of every living thing. These tragic events helped bind the citizens and the local and federal governments into a strong problem-solving union. Tulsa District professionals developed a spirit and dedication which has carried the district through almost 75 years of service to the nation.

Tulsa District Chronology

  • July 1, 1939 - Tulsa District is formed and receives $11 million for work on eight authorized projects. District work includes completing the Great Salt Plains and Fort Supply Lakes already under construction; design and construction work on authorized Canton, Optima, and Hulah Lakes; continue studies leading to authorization of Mannford (Keystone), Oologah, Tenkiller Ferry, and Wister Lakes; and continue cooperation on work for Grand Lake (then under construction) and Markham Ferry and Fort Gibson Dams.
  • December 1940 - Military construction for the Army Air Corps is transferred from the Quartermaster Corps to the Corps of Engineers. Thirteen months later, the Corps undertakes all construction for the Army’s war efforts.
  • Early 1941 - Tulsa District is building the Tulsa Aircraft Assembly Plant #3, (the Bomber Plant) which became home of McDonnell Douglas in Tulsa, Okla. Construction began on the $29 million Midwest City Air Depot (now Tinker Air Force Base) and the Oklahoma Aircraft Assembly Plant #5 in Oklahoma City which was annexed into Tinker in 1947 as Building 3001.
  • December 7, 1941 - Japanese attack Pearl Harbor, triggering U.S. entry into World War II (1941 - 1945). During the war, Tulsa and Denison Districts placed $800 million in military construction and procured special engineering equipment costing more than $100 million.
  • 1944 - Flood Control Act authorizes recreation facilities at reservoirs.
  • April 1, 1945 - Denison District is merged with the Tulsa District after Denison Dam (Lake Texoma) was completed by the Denison District in 1944.
  • July 24, 1946 - McClellan-Kerr Arkansas River navigation project is authorized in Rivers and Harbors Act. The plan includes navigation from Catoosa, Okla., to the Mississippi River.
  • 1950-1953 - Korean Conflict. Tulsa District military construction averages $50 million a year.
  • 1954 - Arkansas River navigation is placed in a “deferred for further study” category. A major engineering problem needed to be solved — 100 million tons of silt flowing down the Arkansas annually could prevent navigation.
  • 1957 - Navigation system construction begins.
  • July 1961 - Tulsa District is relieved of all military construction responsibilities to reemphasize its increasing civil works programs.
  • 1965-1973 - Vietnam War.
  • December 30, 1970 - McClellan-Kerr Arkansas River Navigation System is ready for use: 448 miles, 17 locks and dams.
  • January 21, 1971 - First tow travels full length of navigation system, arrives at Port of Catoosa.
  • June 5, 1971 - President Nixon dedicates $1.2 billion navigation system.
  • 1972 - Clean Water Act extends Corps regulatory authority (Section 404 Permits) to all waters of the United States.
  • October 1, 1980 - The portion of the Tulsa District lying within the state of Arkansas is transferred to the Little Rock District.
  • 1981 - Tulsa District resumes military responsibility for four installations in Arkansas and five in Oklahoma.
  • 1982 - Tulsa District gives up the small pieces of Missouri, New Mexico, and Colorado and picks up the remainder of the Arkansas River Basin in Kansas.
  • August 1985 - After a November 1984 fire destroyed 17 acres of the roof of Building 3001, Tinker Air Force Base, Tulsa District completes the $63.5 million repairs.
  • October 1, 1985 - Tulsa assumes duties for two Air Force bases and one Department of Energy plant in the Texas panhandle; Arkansas military installations are shifted to the Little Rock District.
  • 1986 - Passage of an omnibus water bill, the Water Resources Development Act of 1986 which was the first omnibus bill in 16 years, authorizes numerous projects for Tulsa District and heralds a new era of local/federal cost-sharing partnership.
  • 1989 - Tulsa became the Design Center for the Hazardous, Toxic, and Radiological Waste program for the entire five state Southwestern Division.
  • 1995- Tulsa District, working under the Federal Emergency Management Agency, responds to the bombing attack on the Murrah Federal Building in Oklahoma City. The Corps primary role was public works and engineering.
  • 2000- Mingo Creek Local Protection Project in Tulsa completed. The project consists of construction of 23 floodwater detention sites and approx. 10 miles of channelization along Mingo Creek and its tributaries.  It reduced flooding to approx. 3,000 single family residences and 125 apartment buildings in the flood plain.
  • 2006- Tenkiller Auxiliary Spillway completed and dedication. The auxiliary spillway has five 50-foot wide by 35-foot high tainter gates constructed near the right abutment of the embankment. The spillway structure is similar to the existing spillway. In addition, a new Highway 100 bridge was built to carry traffic across the upstream approach channel for the new spillway.
  • 2009- Tulsa District receives funding for more than 200 projects across the district as part of the American Recovery and Reinvestment Act of 2009. The total funding received totaled more than $125 million.
  • 2011- The district completed all Base Realignment and Closure Act of 2005 construction projects meeting the September 2011 deadline.
  • 2012- For the first time on the McClellan-Kerr Arkansas River Navigation System, a pintle ball is removed and replaced at one of the system's locks. Workers drained all water from the lock, raised the dam gate, removed the damaged pintle and installed the new pintle.
  • 2013- A Supersaturated Dissolved Oxygen System is completed at Tenkiller Dam in Oklahoma. The stream below the dam is home to a trout fishery, that during times of drought experiences low dissolved oxygen levels and high water temperatures that results in fish kills. As a result of a multi-agency effort, a two-part mechanical solution was developed to prevent further fish kills below the dam. The low flow pipe system and the Supersaturated Dissolved Oxygen System were the result of a partnership betweenthe Corps of Engineers, Oklahoma Department of Wildlife Conservation, Southwestern Power Administration, U.S. Fish and Wildlife Service, Oklahoma Water Resources Board, Sequoyah Fuel, Tenkiller Utilities, Trout Unlimited, and Tulsa Fly Fisherman.