R.S. Kerr piping
Installing the new stainless steel hydraulic pipelines are left to right,Tulsa District employees David Ford and Christopher Anderson. Crews from the Tulsa District have installed new stainless pipes in three of the districts lock and dams with two more scheduled for replacement as money becomes available.

Download Image: Full Size (1.12 MB)
Tags:
Photo by: Victor Heister |  VIRIN: 130610-A-CE999-006.JPG