141002-A-PO406-001
The SH-100 bridge over Tenkiller Dam will close at 7 a.m., Tuesday, Oct. 14, 2014 so workers can repair hatch covers on the road's surface. The road closure is expected to last four months.

Download Image: Full Size (0.18 MB)
Photo by: U.S. Army Corps of Engineers |  VIRIN: 141002-A-PO406-001.JPG