Tulsa District Regulatory Permits for Public Comment

PURPOSE:  The purpose of these public notices are to inform you of a proposal for work in which you might be interested and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest in relation to Section 10 and Section 404.

SECTION 10: The U.S. Army Corps of Engineers is directed by Congress through Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) to regulate all work or structures in or affecting the course, condition, or capacity of navigable waters of the United States.  The intent of this law is to protect the navigable capacity of waters important to interstate commerce.

SECTION 404: The U.S. Army Corps of Engineers is directed by Congress through Section 404 of the Clean Water Act (33 USC 1344) to regulate the discharges of dredged and fill material into all waters of the United States.  These waters include lakes, rivers, streams, mudflats, sandflats, sloughs, wet meadows, natural ponds, and wetlands adjacent to other waters.  The intent of the law is to protect these waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical, and biological integrity.

PUBLIC NOTICE MAILING LIST:  If you would like to be added to our Public Notice Mailing List, please submit your information to our email address at CESWT-RO@usace.army.mil or the mailing address below. 

U.S. Army Corps of Engineers
CESWT-RO
2488 E 81st Street
Tulsa, OK  74137-4290

 

408-SWT-2022-19

CESWT-RO
Published Dec. 1, 2025
Expiration date: 1/1/2026

The proposed project plan involves the rebuilding of an approximately 7.5 miles of a 138 kV transmission line within Tulsa County, OK. A portion of this project is located along the Jenks Levee that consist of 15 wood H-frame transmission line structures. This portion of the project would replace those structures with new steel monopole structures within the existing 100-foot ROW, with structures 2/9, 2/10, and 3/1 having drilled concrete piers with the others having direct embed with concrete backfill. The portion of the transmission line that crosses the Arkansas River will only be reconductored and the two dead end structures on either side will not be replaced.