Tulsa District Regulatory Permits for Public Comment

PURPOSE:  The purpose of these public notices are to inform you of a proposal for work in which you might be interested and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest in relation to Section 10 and Section 404.

SECTION 10: The U.S. Army Corps of Engineers is directed by Congress through Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) to regulate all work or structures in or affecting the course, condition, or capacity of navigable waters of the United States.  The intent of this law is to protect the navigable capacity of waters important to interstate commerce.

SECTION 404: The U.S. Army Corps of Engineers is directed by Congress through Section 404 of the Clean Water Act (33 USC 1344) to regulate the discharges of dredged and fill material into all waters of the United States.  These waters include lakes, rivers, streams, mudflats, sandflats, sloughs, wet meadows, natural ponds, and wetlands adjacent to other waters.  The intent of the law is to protect these waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical, and biological integrity.

PUBLIC NOTICE MAILING LIST:  If you would like to be added to our Public Notice Mailing List, please submit your information to our email address at CESWT-RO@usace.army.mil or the mailing address below. 

U.S. Army Corps of Engineers
CESWT-RO
2488 E 81st Street
Tulsa, OK  74137-4290

 

408-SWT-2024-0010

CESWT-RO
Published April 3, 2025
Expiration date: 4/13/2025

US-56 Bridge replacement over the Pawnee River in Larned, Kansas. US-56 reconstruction will include driving new H-Piles (HP)12x53 for the abutments and piers, benching new abutments to an elevation of 1998 feet (approximately 2 feet higher than the historical high-water level), protecting the abutment slopes with 18-inch riprap, and removing the soil mass within the Pawnee River to an elevation of 1988 feet. The north abutment modifications will occur in front of (downslope from) the existing abutment foundations and extend from approximately 35 feet east of roadway center to 55 feet west of roadway center.