NEPA Notices

  • Tulsa River Parks Authority - Pedestrian Bridge Replacement

    The City of Tulsa -Tulsa River Parks Authority, in association with The Gathering Place Tulsa Community Foundation, is proposing to replace the Pedestrian Bridge across the Arkansas River in Tulsa, Tulsa County, Oklahoma (T19N R12E SN13) adjacent to the Zink Dam. Components of the pedestrian bridge replacement would impact Levee C of the Tulsa – West Tulsa (TWT) levee system, a federally constructed levee. The levee was constructed by the U.S. Army Corps of Engineers, and after completion in 1945, ownership was transferred to the Tulsa County Drainage District No. 12 for continued operations, maintenance, repairs, rehabilitation, and replacement actions. The proposed alterations and modifications are operation and maintenance responsibilities of the non-Federal sponsor, the City of Tulsa, and will be implemented at no cost to the federal government. Site location maps are included below for reference.
  • Corps seeks public comment for Lake Texoma Shoreline Management Plan revision

    The 30-day public comment period for the review of the draft Lake Texoma Shoreline Management Plan revision begins Dec. 2 and will conclude Jan. 2. The Tulsa District is providing a virtual public involvement presentation to promote public education and input related to the draft Lake Texoma SMP. Virtual presentations are available at https://www.swt.usace.army.mil/Locations/Tulsa-District-Lakes/Oklahoma/Lake-Texoma/. Links to the draft shoreline management plan, finding of no significant impact letter, public comment forms and shoreline management presentations, are available on the Tulsa District website at https://www.swt.usace.army.mil/Missions/Recreation/Shoreline-Management-Plans/. The Shoreline Management Plan addresses the rules and guidelines that govern private shoreline uses, such as private boat docks, vegetation modification, and similar uses of USACE federally owned fee property.
  • Corps finds ‘no significant impact’ for Lake Texoma revised shoreline management plan

    According to the Tulsa District’s “Finding of no significant impact” letter, available on the Tulsa District website and in the USACE Headquarters Library. - The FONSI letter is located at the USACE Headquarters Library at https://usace.contentdm.oclc.org/digital/collection/p16021coll7/id/16497 - No compensatory mitigation is required - Final draft environmental assessment and FONSI will be complete by January 2, 2021 - The SMP revision will have no effect on species listed in the Endangered Species Act of 1973 - All relevant environmental laws have been considered and agency coordination is complete - According to the FONSI letter, public review of the draft SMP, environmental assessment, and FONSI will be completed by January 2, 2021
  • Public Notice RepCorrection: After action environmental assessment for the Webbers pool and Robert S. Kerr pool emergency dredging and placement

    https://www.youtube.com/watch?v=EREbPV7YqZs&feature=youtu.be Information included in the below public notice, which was published Aug 28, included a presentation with incorrect information. The information is in the summary of the article. The video of the presentation was updated and provides corrected information. The public notice remains the same. The Tulsa District, U.S. Army Corps of Engineers, is soliciting comments from the public and agencies on the potential effects of the emergency dredging and placement of dredged spoils activity that occurred during the spring and summer of 2019, as well as, the effects of the water drawdown, impact to the mussel population that was affected as a result of the drawdown, and mitigation efforts, on the Arkansas River, southeast of Tulsa, Oklahoma.  The Corps has initiated an after action Environmental Assessment (EA) for this activity that occurred in the Webbers Pool and Robert S. Kerr Pool in Oklahoma.  The EA for this after action is authorized in Section 216 of the River and Harbor Flood Control Act of 1970 and Section 1202 of the Water Infrastructure Improvements for the Nation Act of 2016.  The EA will assess how the action affected the human environment and to make the determination if the action was compliant with the National Environmental Policy Act (NEPA).  Your comments will help the Corps in development of this EA. In May and June 2019 record rainfall fell in Southeastern Kansas and Northeastern Oklahoma which caused widespread flooding in the region.  Approximately 15 Corps of Engineers reservoirs in the Upper Arkansas River Basin, Verdigris River Basin, and Grand (Neosho) River Basin, all within Tulsa District, flood pools were flooded to the top of their capacity.  With so many reservoirs at the top of their flood pool capacity, the Tulsa District managed reservoir releases so there was a balanced approach to evacuating flood waters from all pools.  Unfortunately, significant and in some cases, catastrophic flooding was unavoidable due to the received rainfall.  River flows, measured in cubic feet per second (CFS), were overwhelming within large portions of the river system.  Below Keystone Dam just west of Tulsa, the rate of river flow approached 300,000 CFS at its maximum volume and was flowing at 600,000 CFS at W.D. Mayo Dam Lock and Dam 14. The McLellan-Kerr Arkansas River Navigation System (MKARNS) just downstream from the Arkansas River confluence with the Verdigris River and the Grand (Neosho) River had a sustained volume of well over 600,000 CFS over a duration of more than a week.  This increased river flow was carrying an enormous volume of sediment which was transported from the three upstream feeder river basins and was passed through upstream dams and into the Navigation System, where much of it was subsequently deposited.  Result of this increased sedimentation was 3 miles of river channel was clogged with an estimated 1,000,000 cubic yards of sediment.  This material had to be removed before the Navigation System could be reopened for navigable traffic and interstate commerce.  Therefore, the Tulsa District made the decision to commence dredging and dredge spoil operations prior to NEPA review so economic impacts to the region would be reduced. There was another complicating factor other than three miles of river channel being clogged with sedimentation.  On May 23, 2019 two fully-loaded barges moored in the Muskogee area tore loose and were carried downstream, where they collided with the dam at Webbers Falls and sunk.  The barges were forced against three of the structure's open gates.  The two sunken barges impeded the operation of the gates and those gates could not be closed, resulting in the drawdown of the pools and subsequent negative impacts to mussel populations.  Removal of these barges was dependent on the emergency dredging action, specifically the portion within the Robert S. Kerr pool.  The salvage crew hired for this task utilized a tow barge which the only feasible means of travel was up the McLellan-Kerr Arkansas River Navigation System to the Webber Falls Lock and Dam. Pursuant to Section 102 of the NEPA as implemented by the regulations promulgated by the Council on Environmental Quality (40 Code of Federal Regulations Parts 1500-1508 and U.S. Army Corps of Engineers’ Engineering Regulation 200-2-2), an Environmental Assessment will be conducted to ensure compliance with the NEPA and appropriate environmental laws, regulations, agency policies and guidance, and executive orders, and to provide any necessary mitigation as a result of impacts from the emergency dredging, discharge of dredged material, and draw down of the pool.  Our office would like to solicit any input you may have with respect to this after action environmental assessment for the Webbers Pool and Robert S. Kerr Pool Emergency Dredging and Placement to assist us as we progress through the NEPA process.  A brief presentation regarding this action is available starting on August 20, 2020, on the Tulsa District website:  www.swt.usace.army.mil.   We look forward to receiving your written comments, which are due by September 20, 2020.  Please contact Mr. Jeff Knack, Chief, Natural Resources and Recreation Branch, Tulsa District, by mail U.S. Army Corps of Engineers, 2488 E 81st Street, Tulsa, Oklahoma  74137-4290, email at jeff.knack@usace.army.mil, or telephone at (918) 669-7660 with comments, questions, or the need for further information.

ArticleCS

  • Corps, Drainage District Sign Feasibility Agreement for Tulsa-West Tulsa Levee Study

    - Tulsa District and Tulsa County Drainage District 12 officials signed the feasibility study cost sharing agreement today. - The Federal Government has allocated $3 million to study flood risk reduction possibilities for the Tulsa-West Tulsa Levee System. - The Tulsa-West Tulsa Levee was constructed in the 1940s and turned over to the levee sponsor for operation and maintenance after it was completed. - The Tulsa-West Tulsa Feasibility Study will take two years to complete and is funded through the Bipartisan Budget Act of 2018 Supplemental signed into law by President Donald J. Trump in February 2018.
  • Tulsa West Tulsa Levee Study Included in Supplemental Disaster Recovery Funding

    USACE, Headquarters included $3 million for feasibility study related to Tulsa West Tulsa flood risk reduction. Tulsa District will work with the levee sponsor, Tulsa County, to accomplish the study. Tulsa District will present a report identifying options related to flood risk reduction capabilities of the Tulsa West Tulsa Levee to Congress at the conclusion of the study. A time frame for the study has not yet been released.
  • U.S. Army Corps of Engineers Identifies Long-Term Disaster Recovery Projects and Additional Short-Term Repairs to be Accomplished with 2018 Supplemental Funding

    The U.S. Army Corps of Engineers (USACE) announced today additional work that it plans to accomplish with the funding provided for disaster recovery in Public Law 115-123, the Bipartisan Budget Act of 2018, signed into law February 9, 2018.
  • Tulsa District Environmental Impact Assessment of the Bridgeview Resort and Marina Expansion Project at Lake Texoma

    The Tulsa District has assessed the environmental impact of the Bridgeview Resort and Marina Expansion project at Lake Texoma, Marshall County, Oklahoma.
  • Corps seeks to reduce water-related fatalities during 2018 recreation season

    TULSA — Most Tulsa District, U.S. Army Corps of Engineers parks re-opened for the 2018 recreation season, April 1 and as the largest provider of water-based outdoor recreation in the nation, the Corps is working to reduce water-related fatalities by educating the public on water safety.The Tulsa District, which manages 256 recreation areas at 37
  • Road, parking lot closures to temporarily impact Oologah Lake recreation

    TULSA – The U.S. Army Corps of Engineers, Tulsa District advises visitors to be aware of temporary delays due to a series of parking lot, road and boat ramp projects aimed at improving the long-term visitor experience at Oologah Lake. The first location for road and parking lot improvements will take place at Hawthorne Day Use Area, May 9.Visitors
  • Corps to host meeting about government contracts in Kansas

    The Corps of Engineers, Tulsa District will host an informational meeting to educate attendees about government contracts, March 21 from 9 a.m. to 11:30 a.m at the WSU Old Town located at 238 N. Mead in Wichita The types of contracts typically available include service and construction contracts including the cleaning and maintenance of buildings, mowing, debris removal, equipment maintenance and electrical work. The U.S. Army Corps of Engineers, Tulsa District currently has more than $5 million in government service and construction contracts available.
  • Final Supplemental Environmental Assessment for Arcadia Lake Trail Project

    Regional Planning and Environmental Center  TO INTERESTED PARTIES The U.S. Army Corps of Engineers - Tulsa District, and the Regional Planning and Environmental Center, in coordination with the City of Edmond, Oklahoma, has assessed the environmental impacts of construction and operation of a multi-use trail system (Arcadia Lake Trail Project) at
  • President's Fiscal 2018 Budget for U.S. Army Corps of Engineers Civil Works Program released, funds Arkansas River Corridor Study

    The President’s Budget for fiscal year 2018 (FY 2018) includes $5.002 billion in gross discretionary funding for the Civil Works program of the U.S. Army Corps of Engineers (Corps). "The fiscal 2018 Civil Works budget for the U.S. Army Corps of Engineers reflects the administration's priorities to support and improve the nation's economy and infrastructure, and to protect the American people," said Mr. Doug Lamont, senior official performing the duties of the Assistant Secretary of the Army for Civil Works. "This Budget supports the core mission areas of coastal and inland navigation, reducing flood risks from riverine flooding and along our coasts, and restoring aquatic ecosystems.”
  • Owen to take command of SWD

    Colonel Paul E. Owen, currently the Chief of Staff for the U.S. Army Corps of Engineers in Washington D.C., is slated to take command of the Southwestern Division, U.S. Army Corps of Engineers, headquartered in Dallas.